Solution for Transmission Tower Manufacturers

Home    Downloads

Plug the gaps in the ERP
Design Planning Production
BOM & Routing information extraction from CAD. Material planning estimation for purchase of Raw material Material Optimization based on actual stocks available
BOM, Routing data upload to ERP Time estimation for production planning Shop Drawing for Production. CNC code generation
  • Integration without changing your work flow

This solution is specially tailored for automating time consuming processes, as listed below, for Transmission Tower Industry.

  • BOM generation
  • Weight calculations of materials and Zinc required
  • Making Shop drawings and WinSteel drawings
  • Making routes and calculating process time
  • Optimizing and estimating best stocks
  • CNC for machines

Solution for Transmission Tower Manufacturers

Click on Picture for larger image 

  • Fill the gap for BOM generation 

This is possible using PLUS AIDE and PLUS ADEPT applications by using below steps :

  • Prepare structural drawing and annotate it using PLUS AIDE. Enter the necessary data for BOM and Routing.
  • Export BOM data for PLUS ADEPT
  • Run PLUS ADEPT, Add other BOM items as necessary
  • Click Export BOM and Job done

Generate BOM with a Click of Button using PLUS AIDE and PLUS ADEPT app

  • Piece weight and zinc weight calculations

With PLUS ADEPT you can calculate total piece weight and zinc weight in no time

Generate BOM with a Click of Button using PLUS AIDE and PLUS ADEPT app

  • Optimizing Angles and Plates with Industry Constrains

PLUS TOWEROPT helps you to optimize angles with three open pallets and plates with first X Cut. It gives you quick and accurate results to minimize waste.

Plates Opt
Optimize Plates with First X Cut

Angles Opt
Optimize Angles with Three Open Palets

  • Work in units of your choice

This solution provides you the flexibility to work in units of your choice. Units that are selected are not only limited to apps. You can even make drawings in mm and inch as shown in the figure.

Click on Picture for larger image

Shop Drawing in mm
Shop Drawing in mm

Shop Drawing in inch
Shop Drawing in inch

Return on Investment.

  • Save raw material up to 1 % with PLUS TowerOpt

  • Annual Production = 30,000 MT Per Annum

  • Conservative savings only 1% = 300 MT Per Annum

  • Rate of raw material = Rs 35000/MT

  • Savings per annum = Rs 105 lacs

 

Home    Downloads   Nirvanatec