PLUS Tower Opt:
Material optimization software
saves money by reducing waste and increasing productivity at both the planning
stage and production stage. Standard production constraints
-
Angle optimization with Maximum 3-open pallets (3 different parts at a time).
-
Consider slow moving bend items separately, optimize cleats from cut lengths.
-
Plate optimization with first X-cut.
|
|